Tuesday, May 03, 2005


Marcos and his guys came again Saturday and kicked butt. They fixed the exterior door (it swelled in the heat). They cut the concrete for the crawl space door. They hung the two regular doors and put in the kits for the bi-fold and bypass doors. They built access panel doors for the networking closet and hot water heater access. They put up all the trim. And they primed everything.

Comments

Post a Comment

Backlinks (Sites that link here)

Post a backlink

<< Back to blog home