Priority | Room | Description | Cost - Labor | Cost - Parts | Duration | Dates of work | Worker(s) | Equipment, supplies & parts |
Comments |
1 | Basement | Replace electrical panel & power entrance | $500 | $550 | 3 days | 8/23-8/25 | Mike | Electrical panel | |
1 | Bedrooms | Light switch needs replacing | $50 | $25 | 2 hours | Mike | |||
1 | Basement | Replace furnace filter | $0 | $20 | 1 hour | Us | Filter | ||
1 | Bathroom | Prep & paint trim & cupboards | $0 | $25 | 1 day | 8/24-8/25 | Corinne & friends | Tape, brushes, paint, sandpaper, deglosser | |
1 | Bathroom | Replace shower head | $0 | $50 | 1 hour | Us | Shower head, wrench | ||
1 | Bedrooms | Prep & paint trim (& walls?) | $0 | $25 | 3 days | 8/24-8/25 | Corinne & friends | Tape, brushes, paint, sandpaper, deglosser | |
1 | Bedrooms | Pull up carpet | $0 | $0 | 1 day | 8/20-8/21 | Us | Carpet knives, crowbar/hammer | |
1 | Bedrooms | Refinish hardwood floors | $800 | $0 | 2 days | 9/8-9/10 | Refinisher | N/A | |
1 | Doors | Re-key or replace locks on 3 doors | $100 | $150 | 1 hour | Locksmith | N/A | Tied to glass door in kitchen | |
1 | Kitchen | Replace/fix lock on sliding glass door | $50 | $10 | 1 hour | Locksmith | N/A | ||
1 | Kitchen | Install dishwasher | $0 | $600 | 3-4 days | 8/26-8/29 | Tim & Corinne | Saw, dishwasher | If it fits; have to run water & power |
1 | Outside | Dig trenches from gutters | $100 | $100 | 2 days | TJ? | Shovel, pipe, "ditcher" | How much to rent a ditcher? Could we get it up the stairs? | |
1 | Whole house | Install smoke detectors | $0 | $50 | 0.5 days | Ladder, smoke detectors | |||
1 | Roof | Herbicide on roof to kill moss | $0 | $20 | 0.5 days | Benjamin | Ladder, herbicide/zinc strips from Tim | ||
TOTAL PRI 1 | $1,600 | $1,605 | |||||||
$3,205 | |||||||||
2 | Bathroom | Replace light fixture above sink | $100 | $150 | 1 day | Mike/Tim | Fixture | ||
2 | Bathroom | Replace shower rod with curved rod | $0 | $50 | 1 day | Us | Shower rod | ||
2 | Kitchen | Replace electrical range with gas range | $120 | $550 | 1 hour | 9/5 | Gas company | Gas range | Installation of new range must be done after new countertops are finished! Might be able to exchange electric range |
2 | Kitchen | Tile countertops | $0 | $500 | 7 days | 8/26-8/26, 8/31-9/5 |
Tim, Corinne & Mike | Tile, tile cutter, plywood, saw | Replace countertops down to plywood; Tied to dishwasher |
2 | Whole house | Replace electrical outlets | $100 | $150 | 1 day | Mike | Outlets | GFI's where applicable | |
2 | Fireplace | Full out fireplace insert | $0 | $0 | .5 day | Benjamin & friends | |||
2 | Fireplace | Put hat on (& clean) chimney | $300 | $100 | Chimney guy | N/A | |||
2 | Fireplace | Fix flu | $100 | $100 | Chimney guy | ||||
2 | Outside | Install porch swing | $0 | $200 | 1 day | Us & Tim | Stud finder, drill, chain, swing | ||
TOTAL PRI 2 | $720 | $1,800 | |||||||
$2,520 | TOTAL PRI 1 + 2 | $5,725 | |||||||
3 | Basement | Run CAT-6 cable | $600 | $300 | Mike | Conduits, panels | |||
3 | Basement | Run coax cable | $600 | $300 | Mike | Coax cable, panels | |||
3 | Basement | Run phone lines | $600 | $200 | Mike | Phone line, panels | |||
3 | Bathroom | Replace sink | $200 | $200 | ? | Sink, wrench | |||
3 | Bathroom | Replace/paint/refinish medicine cabinet | $0 | $25 | Us | Tape, brushes, paint, sandpaper, deglosser, new knob | |||
3 | Kitchen | Paint cabinets | $0 | $150 | Us | Tape, brushes, paint, sandpaper, deglosser | |||
TOTAL PRI 3 | $2,000 | $1,175 | |||||||
$3,175 | TOTAL PRI 1+2+3 | $8,900 | |||||||
4 | Attic | Replace knob-and-tube wiring | Mike | ||||||
4 | Basement | Framing | Contractor | ||||||
4 | Basement | Install Pergo flooring | Us | ||||||
4 | Basement | Replace knob-and-tube wiring | Mike | ||||||
4 | Basement | Sheet rocking | Contractor | ||||||
4 | Bathroom | Replace fixtures | Us | ||||||
4 | Kitchen | Extend island | |||||||
4 | Kitchen | Install French doors | |||||||
4 | Whole house | Paint walls | $0 | Us | |||||
4 | Crawl space | I-bolts & sil plate | |||||||
4 | Crawl space | Foundation patch/caulc/fix | |||||||
TOTAL PRI 4 | $0 | $0 | $0 | ||||||
5 | Bedroom | Replace blue blinds | |||||||
5 | Crawl space | Foundation repair | |||||||
5 | Crawl space | Raise floor | |||||||
5 | Crawl space | Finish crawl space | |||||||
TOTAL PRI 5 | $0 | $0 | $0 |